
Nov 22 – Present
This project aims to site formation works for the Kwu Tung North New Development. One of its majority works include construction of road and associated road drainage system. There are more than 50 nos. of special manholes with sizing at least 3500 x 5000 footprint required with numbers of utilities and pipes intersecting the manholes. The works carry out systematic design tailored and ease for each manhole and backdrop capable for factory fabrication, logistic and on site assembly and zip up works.
Richwell Engineering Limited
Contact our team to learn more about how MiCON can deliver similar results for your next construction project.