Design and Supply of DfMA Manhole & Backdrops for Kwu Tung North New Development Area, Phase 1 – Contract No. ND2019/01
Project Detail

Design and Supply of DfMA Manhole & Backdrops for Kwu Tung North New Development Area, Phase 1 – Contract No. ND2019/01

2022.11 - Present

Period

Nov 22 – Present

Description

This project aims to site formation works for the Kwu Tung North New Development. One of its majority works include construction of road and associated road drainage system. There are more than 50 nos. of special manholes with sizing at least 3500 x 5000 footprint required with numbers of utilities and pipes intersecting the manholes. The works carry out systematic design tailored and ease for each manhole and backdrop capable for factory fabrication, logistic and on site assembly and zip up works.

Client

Richwell Engineering Limited