MiC Lift and Pedestrian Walkway System between Saddle Ridge Garden and Sai Sha Road – Contract No. HY/2022/07
Project Detail

MiC Lift and Pedestrian Walkway System between Saddle Ridge Garden and Sai Sha Road – Contract No. HY/2022/07

2023.06 - Present

Period

Jun 23 – Present

Description

This project aims to upgrade existing cast-in-situ Steel Twin Lift Towers (2 units) to MiC Lift Towers. Apart from traditional MiC construction, the lift components will also be installed in the modules in factory for minimizing MEP installation on site. MiCON is responsible for structural design ease for factory fabrication covering architectural, structural and MEP aspects, logistic and site assembly construction.

Client

Wing Hing Construction Co., Ltd

Interested in This Project?

Contact our team to learn more about how MiCON can deliver similar results for your next construction project.

View All Projects